Hydrant system expansion
Client:RenovaLocation:Quequén, Buenos Aires
Expansion of the plant's hydrant network.
A selection of EPC projects delivered in the region for benchmark industrial operators.
Expansion of the plant's hydrant network.
Preaction valve replacement inside freezing chamber.
Oil, oil filter, fuel filter and air filter change. Automatic start inspection.
Welding of 3,000 meters of HDPE pipe Ø 200 mm.
325 m³ FM Approved fire water reserve tank. Diameter 6.11 m · height 11.74 m.
Our engineering team advises you at no cost on the right technical solution and applicable regulatory compliance.
Request technical quote